BEEHE L10/L11 equipment supports manufacturing and validation workflows for liquid-cooled nodes and racks. The family includes separate process stations that can be selected around the required production sequence.
Key features
- PLC/HMI control supports process settings, sensor monitoring and pass/fail evaluation.
- Pressure/leak testing uses clean compressed air or nitrogen.
- Node and rack connection arrangements are described, including UQD04/UQD08 and clamp interfaces.
- Modbus RTU/TCP communication is listed.
Configurations and specifications
| Process station | Function / listed operating range |
|---|---|
| Pressure and leak test | Two-channel pressure/leak testing |
| Flushing and filling | Rack flow 40–162 L/min; node flow 5–20 L/min |
| TIM break / curing | 30–80°C thermal processing; 25 kW heater |
| Drain, dry and nitrogen fill | Drying 40–80°C; nitrogen fill 30–60 kPa |
| Vacuum and quantitative fill | Rack 7–12 L/min; node 3–5 L/min |
Application and selection
Select the stations and fixtures for the product and process rather than assuming every station is included in one package. The quantitative filling unit lists accuracy of ±3% of the setpoint for racks and ±5% for nodes.
Brand: BEEHE. Admetal is an official distributor of BEEHE products.